Lu Fan,Shen Liangduo,Gao Yu, et al. Numerical study on three-dimensional tidal current characteristics of Zhoushan Green Petrochemical Company[J]. Haiyang Xuebao,2022, 44(5):134–147 doi: 10.12284/hyxb2022079
Citation: Lu Fan,Shen Liangduo,Gao Yu, et al. Numerical study on three-dimensional tidal current characteristics of Zhoushan Green Petrochemical Company[J]. Haiyang Xuebao,2022, 44(5):134–147 doi: 10.12284/hyxb2022079

Numerical study on three-dimensional tidal current characteristics of Zhoushan Green Petrochemical Company

doi: 10.12284/hyxb2022079
  • Received Date: 2021-08-15
  • Rev Recd Date: 2021-12-17
  • Available Online: 2022-06-15
  • Publish Date: 2022-06-15
  • In this paper, MIKE3 is used to establish a three-dimensional hydrodynamic model of Zhoushan and Ningbo. Based on the tidal current verification with the measured data, the difference between the three-dimensional model and the two-dimensional model is compared. Also, the influence of the change of the tidal current field around the Zhoushan Green Petrochemical Phase III reclamation project before and after the implementation is mainly predicted and analyzed. The results show that: (1) Under the same initial conditions, the tidal level and tidal current validation results of two-dimensional model and three-dimensional model are good, and the two-dimensional results are closer to the measured values in some cases. (2) The three-dimensional vertical velocity distribution shows a decreasing trend with the increase of water depth. In general, the tidal current fitting is good, and the relative error of velocity below 0.6H water depth is between 10% and 15%. Considering that the model may not consider the influence of wind field and wave, the calculated surface velocity of local stations is slightly larger than the measured value; the vertical distribution of flow direction is nearly consistent. (3) Before and after the reclamation project, there was no obvious influence on the tidal current field around the project. Only in the northeast, southeast and northwest corner of Dayushan Island, affected by the “bend improvement” and the channel closure between small islands, there is a change in the local tidal current form. On the whole, the layout of reclamation projects conforming to the shoreline will have an effect on the local coastal tidal current, and almost no effect on the large scale tidal current field in the far sea.
  • loading
  • [1]
    胡雪晴. 海洋工程对水文动力环境影响分析[J]. 中阿科技论坛, 2020(5): 63−64.

    Hu Xueqing. Analysis of impact of marine engineering on hydrodynamic environment[J]. China-Arab States Science and Technology Forum, 2020(5): 63−64.
    [2]
    吴仁豪, 童元正, 张旭锋, 等. 舟山凉潭岛填海工程对水动力及海床演变影响的模拟预测分析[J]. 热带海洋学报, 2011, 30(4): 24−30. doi: 10.3969/j.issn.1009-5470.2011.04.004

    Wu Renhao, Tong Yuanzheng, Zhang Xufeng, et al. Prediction of the effect of reclamation near Liangtan Island in Zhoushan water area[J]. Journal of Tropical Oceanography, 2011, 30(4): 24−30. doi: 10.3969/j.issn.1009-5470.2011.04.004
    [3]
    任一晗, 叶涛焱, 杨铭哲, 等. 围垦对舟山群岛海域潮流结构及潮能分布影响研究[J]. 海洋工程, 2021, 39(2): 80−89.

    Ren Yihan, Ye Taoyan, Yang Mingzhe, et al. Impacts of reclamations on tidal flow structure and tidal energy in the Zhoushan Archipelago sea area[J]. The Ocean Engineering, 2021, 39(2): 80−89.
    [4]
    Safavi S, Saghafian B, Hosseini S A. Characterizing flow pattern and salinity using the 3D MIKE 3 model: Urmia Lake case study[J]. Arabian Journal of Geosciences, 2020, 13(3): 115−126. doi: 10.1007/s12517-020-5095-4
    [5]
    窦明, 左军成, 陈美香, 等. 大洋山围垦工程对邻近海域环境的影响[J]. 海洋环境科学, 2018, 37(3): 409−417, 447. doi: 10.12111/j.cnki.mes20180315

    Dou Ming, Zuo Juncheng, Chen Meixiang, et al. The influence of Dayangshan reclamation project on the environment of adjacent sea area[J]. Marine Environmental Science, 2018, 37(3): 409−417, 447. doi: 10.12111/j.cnki.mes20180315
    [6]
    刘嘉星, 刘长根. 围海造地对天津港附近海域三维潮流场影响的数值模拟研究[J]. 海洋湖沼通报, 2017(4): 79−85.

    Liu Jiaxing, Liu Changgen. Numerical simulation of the impact of reclamation project on the 3D tidal current field near Tianjin Port[J]. Transactions of Oceanology and Limnology, 2017(4): 79−85.
    [7]
    刘金鹏, 拾兵, 吴殿春. 龙口市人工岛周边海域波浪场和水动力场的数值模拟[J]. 海洋湖沼通报, 2021(1): 1−10.

    Liu Jinpeng, Shi Bing, Wu Dianchun. Numerical simulation of wave field and hydrodynamic field around the artificial island in Longkou[J]. Transactions of Oceanology and Limnology, 2021(1): 1−10.
    [8]
    Zamani B, Koch M. Comparison between two hydrodynamic models in simulating physical processes of a reservoir with complex morphology: maroon reservoir[J]. Water, 2020, 12(3): 814−837. doi: 10.3390/w12030814
    [9]
    Soltani S, Askar M B, Bahrami H, et al. Evaluation of sediment transport in the naiband gulf area using Mike21[J]. Open Journal of Geology, 2017, 7(2): 182−192. doi: 10.4236/ojg.2017.72012
    [10]
    Elshemy M, Khadr M, Atta Y, et al. Hydrodynamic and water quality modeling of Lake Manzala (Egypt) under data scarcity[J]. Environmental Earth Sciences, 2016, 75(19): 1329. doi: 10.1007/s12665-016-6136-x
    [11]
    孙平锋, 刘阳, 徐锟. 舟山绿色石化基地围垦平面布置方案[J]. 水运工程, 2021(5): 65−70. doi: 10.3969/j.issn.1002-4972.2021.05.014

    Sun Pingfeng, Liu Yang, Xu Kun. Layout scheme for reclamation of green petrochemical base in Zhoushan[J]. Port & Waterway Engineering, 2021(5): 65−70. doi: 10.3969/j.issn.1002-4972.2021.05.014
    [12]
    熊伟, 刘必劲, 孙昭晨, 等. 宁波舟山近海三维潮汐潮流数值模拟[J]. 水道港口, 2011, 32(6): 399−407. doi: 10.3969/j.issn.1005-8443.2011.06.003

    Xiong Wei, Liu Bijin, Sun Zhaochen, et al. 3D numerical simulation of tide and tidal currents in sea adjacent to Ningbo and Zhoushan[J]. Journal of Waterway and Harbor, 2011, 32(6): 399−407. doi: 10.3969/j.issn.1005-8443.2011.06.003
    [13]
    Willmott C J. On the validation of models[J]. Physical Geography, 1981, 2(2): 184−194. doi: 10.1080/02723646.1981.10642213
    [14]
    安永宁, 吴建政, 朱龙海, 等. 龙口湾冲淤特性对人工岛群建设的响应[J]. 海洋地质动态, 2010, 26(10): 24−30.

    An Yongning, Wu Jianzheng, Zhu Longhai, et al. Response of erosion-deposition pattern to artificial islands construction in Longkou Bay[J]. Marine Geology Letters, 2010, 26(10): 24−30.
    [15]
    李逸聪, 王义刚, 黄惠明. 湾口围填海对钦州湾水动力环境的影响[J]. 水运工程, 2017(3): 44−50. doi: 10.3969/j.issn.1002-4972.2017.03.009

    Li Yicong, Wang Yigang, Huang Huiming. Impacts of bay mouth reclamation on hydrodynamic environment of Qinzhou Bay[J]. Port & Waterway Engineering, 2017(3): 44−50. doi: 10.3969/j.issn.1002-4972.2017.03.009
    [16]
    王世澎, 梁书秀, 孙昭晨. 二维情况下波浪对潮流场作用的数值分析[J]. 海洋学报, 2007, 29(2): 173−178.

    Wang Shipeng, Liang Shuxiu, Sun Zhaochen. The numerical analysis of wave effects on a tidal current in two dimensions[J]. Haiyang Xuebao, 2007, 29(2): 173−178.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(14)  / Tables(1)

    Article views (304) PDF downloads(55) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return